Why This Matters
The growth of solar power is often measured in megawatts, investment value, and the number of projects entering development or operation. These indicators are important, but they do not tell the full story.
A solar PV project is a long-term infrastructure investment. Its value depends not only on the successful completion of construction, but on its ability to operate safely, reliably, and profitably throughout its intended operating life.
This means that risk can emerge at every stage of the project lifecycle.
Before construction begins, decisions around site selection, technology, engineering design, contractors, supply chains, and contractual arrangements can shape the project’s future risk profile. During construction, transportation, storage, installation, testing, and commissioning create additional exposures. Once operational, equipment reliability, natural hazards, fire, electrical systems, grid connections, maintenance, and business interruption become increasingly important.
The risk becomes even more complex as the industry adopts new technologies and project configurations.
Commercial and industrial rooftop solar becomes part of an existing operating facility. Floating solar introduces marine and environmental considerations. Solar-plus-BESS projects combine photovoltaic generation with energy storage technologies that bring their own technical and fire-related exposures.
A loss affecting one component can therefore have consequences far beyond the damaged asset itself.
A failed transformer can interrupt generation. A fire can affect an entire installation. Flooding can prevent access to a site and delay recovery. A BESS incident can affect both the storage system and surrounding infrastructure. And prolonged equipment failure can turn a physical loss into a significant business interruption and financing exposure.
For project owners, investors, lenders, and other stakeholders, the central question is therefore not simply whether a particular risk can occur.
It is whether the project has been designed and prepared to withstand, respond to, and recover from that risk without undermining its long-term value.
This is where risk management becomes an integral part of project development.
Insurance can provide an important layer of financial protection, but insurance alone does not make a project resilient. Effective risk management requires an understanding of the underlying exposures and how they interact—with appropriate attention to prevention, engineering controls, contractual risk allocation, emergency planning, business continuity, risk retention, and risk transfer.
The purpose of this Risk Review is to examine that broader risk landscape.
Rather than looking at solar projects only from the perspective of insurance coverage, it considers the risks that can affect the asset, the operation, the revenue stream, and ultimately the investment itself.